Skip to content
ClientTether Support
Proposals & Work · Feature guide

Proposal Settings

A map of the Proposal settings tab — every sub-tab, what it controls, and why everything is dated by year.

New · Updated Sep 21, 2026 · 5 min read
On this page

1Where proposals are configured

Everything a proposal can contain is defined before you ever quote a job. Settings → Proposal is where that happens, and it’s a big tab — a row of sub-tabs, each responsible for one part of the system. This page is the map; each area has its own article.

2The sub-tabs

Sub-tabWhat lives there
PreferencesHeader information shown on quotes, the proposal naming convention, quote prefix and next quote number, deposit and progress percentages, payment options, and switches such as Disable Create New Proposal and showing estimator or field-manager jobs on the calendar.
Bid TypesThe top-level kinds of work you quote, with their item categories and line items. See Bid Types & Quote Types.
ProductsThe priced catalogue behind line items — costs, standard cost, preset COGS, offers and offer prices, by year. See Line Items & Item Categories.
TemplatesProposal templates and the constants they use. See Templates & Constants.
Tax/DisplayTax districts, material and labor tax, the visual CSS control and the Long Quote default page settings. See Tax Districts and Quote Design & Layout.
PDF Details, Cover Page, About Me, Terms & conditionsThe fixed pages that wrap around a quote, each with its own block editor.
PaymentsGateway keys for taking money on a proposal. See TetherPay.
RoyaltyRoyalty rates and hurdles, and the royalty report, for franchise networks.
OtherProduction managers, subcontractors, specialty lists and similar supporting data.
ArchivesDeleted bid types, categories, line items, quote types, notes and subcontractors — each with a Restore control, and a permanent delete.
Default (v1) / Painter1 DefaultsLegacy defaults for accounts still on an earlier proposal version.

Deleted isn’t gone

Bid types, categories and line items you delete land in Archives and can be restored. Only Permanent Delete removes them for good — which matters, because old proposals reference them.

3Everything is dated by year

Prices, costs and royalty rates carry an Applies to Year. That’s how a quote written last year keeps last year’s prices while this year’s work is quoted at the new ones. When you set up a new year, use Duplicate for Year rather than editing the existing rows.

4Sharing down the network

Bid types can be shared with selected sub-accounts or with All Accounts, and a whole tree can be copied with Copy Bid Type Tree. Constants defined at the Enterprise level can be given local values per sub-account, so a national catalogue can still carry regional labour rates. See Templates & Constants.

5Troubleshooting

There’s no Proposal tab in Settings

The account has no proposal or quoting module enabled, or you aren’t an Admin. See Add-Ons.

A line item disappeared from the worksheet

Check Archives — it was probably deleted — and check the year it applies to.